machine manufacturer & steel building constructor

news

Debugging Steps of K Span Roll Forming Machine Equipment

Update:14 Sep 2018
Summary:

When adjusting the equipment of the changsheng roll For […]

When adjusting the equipment of the changsheng roll Forming Machine, the power must be cut off. When moving the workpiece, pay attention to the safety of the hand. All parts of the Changsheng K Span Machine tool should be connected with lubrication frequently. Each shift should be filled with lubricating oil by the operator. Every six months, the mechanic should fill the rotating bearing parts once. The upper blade of the shearing machine is fixed on the tool holder, and the lower blade is fixed on the work table. A support ball is mounted on the workbench so that the sheet is not scratched when it slides over it. The press cylinder is used to compress the sheet to prevent the sheet from moving during shearing. The guardrail is assembled in order to prevent work-related injuries.

Shearing machine safely rules: before the manipulation to wear tight protective clothing, cuffs fasten, the top hem can not be opened, can not be worn next to the machine, take off clothes, or cloth around the body to prevent equipment damage. A good hat must be worn, and the scorpion should be placed in the cap. No skirts or slippers should be worn. After the shearing machine is cut, the straightness and parallelism of the sheared surface of the sheared sheet should be ensured, and the distortion of the sheet should be reduced as much as possible to obtain a high-quality workpiece back gauge for sheet positioning, and the position is adjusted by the motor. The return trip is generally nitrogen, the speed is fast, and the impact is small.

This roll forming machine is suitable for all kinds of steel plates, copper plates, aluminum plates and non-metal materials with the thickness of the machine tool. It must be a material without hard marks, welding slag, slag inclusions and welds. The name of the machine used: a. Adjust the gap of the blade according to the thickness of the material to be cut.

The machine operator must be familiar with the primary structure, performance and use of the shearing machine. b. Adjust the master or fixture according to the width of the material being cut. c. Make 1 - 3 empty strokes before the machine is operated. The cutting work can be carried out after normal operation. If the equipment is not working properly during use, immediately cut off the power supply and check it.

Copyright © Yingkou ChangSheng Steel Structure Project Co., Ltd .All rights reserved

Created by:HWAQ